How Our Solar Panel Removal Service Works

A proven, systematic approach to solar removal that ensures safety, compliance, and complete documentation at every stage.

Start Your Project

Our 6-Step Process

1

Free Site Assessment

Timeline: Same-day to 48 hours

Our team conducts a comprehensive evaluation of your solar installation to develop an accurate scope of work and quote.

What's included:

  • System size and panel count verification
  • Mounting type assessment (roof, ground, ballasted)
  • Electrical infrastructure review
  • Access evaluation and logistics planning
  • Photo documentation of current state
2

Licensed Electrician Disconnection

Timeline: 2-4 hours

Our licensed electricians safely isolate and disconnect your solar system following all electrical codes and safety protocols.

What's included:

  • Utility notification and coordination
  • System safe-off and lockout/tagout
  • Inverter disconnection
  • Electrical panel modifications
  • Safety verification and testing
3

Panel Removal & Sorting

Timeline: 1-3 days (varies by size)

Careful removal of all solar panels with damage prevention protocols and immediate sorting for recycling or refurbishment.

What's included:

  • Damage-free panel removal
  • Panel testing and grading
  • Sorting for recycling vs. refurbishment
  • Secure packaging and labeling
  • Chain of custody documentation initiated
4

Infrastructure Removal

Timeline: 1-2 days

Complete removal of all racking, mounting hardware, wiring, conduit, and concrete footings as applicable.

What's included:

  • Racking and rail system removal
  • Mounting hardware extraction
  • Conduit and wiring removal
  • Junction box removal
  • Concrete footing removal (if required)
5

Site Restoration & Grading

Timeline: 1-3 days

Return your property to its original condition with proper sealing, grading, and restoration services.

What's included:

  • Roof penetration sealing (residential)
  • Ground grading and leveling
  • Vegetation restoration (solar farms)
  • Final site cleanup
  • Before/after photo documentation
6

Certificate of Recycling Delivered

Timeline: Within 30 days of completion

Complete documentation package including chain of custody records and official Certificate of Recycling for your compliance records.

What's included:

  • Complete chain of custody documentation
  • Official Certificate of Recycling
  • Weight manifests and material breakdown
  • Final project report
  • Compliance documentation package

Project Timelines

1-2 Days

Residential

Standard rooftop system

3-10 Days

Commercial

Varies by system size

2-8 Weeks

Solar Farm

Including site restoration